ChartPro is meant for project management and it can be used to design projects that rely on a Work Breakdown Structure (WBS) chart.
A WBS in project management and systems engineering, is a tool that defines a project and groups the project's discrete work elements in a way that helps organize and define the total work scope of the project.
The traditional WBS chart displays varying levels of detail starting with the highest or broadest at the top. Then, each item or element of the project is defined at subsequent levels until the appropriate level of detail is achieved. Example of a work breakdown structure of a aircraft system.
A WBS element may be a product, data, a service, or any combination. WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Additionally the WBS is a dynamic tool and can be revised and updated as needed by the project manager.
Here are some key features of "ChartPro":
· Easy-to-use.
· Multi-document interface.
· Minimizes to system tray.
· Customized toolbars.
· Animated collapse and expansion of items.
· Images for each item.
· Rotation of the structure by 90 degrees.
· Full drag and drop support.
· Shapes of each individual item.
· Color of individual item.
· Width and height of each item.
· Text placement within each item.
· Office 2010 themes.
Limitations:
· Nag screen
· 30 days trial period
· Printing disabled
· Full screen mode disabled
What's New in This Release: [ read full changelog ]
· Buffer overflow vulnerability fix
· Minor changes