When you publish your project for the very firsttime Project 2007 create a Project workspace in Sharepoint (3.0) 2007. Here you can add your documents, risks issues and much more.
The problem is that Project Server 2007 creates always the same Work Sapce and it is always empty.
You can create your own workspace template and have this template as default however you cannot change the templates based on your project type.
Or When you are using Microsoft Project 2007 with PWA (Project Web Access) as timesheet or an external timesheet you will sometimes discover some errors, or when you have like hundreds of project in your project server and it is almost impossible to find what you are looking for, Or when you project client crashes and you find out there are several projects are checked out to you and you must check them in one by one in PWA, the following highlights possible errors in project-client:
With Adept tool for MS project 2007 you can dynamically select templates based on your project type on the run. i.e. Before you publish you can select the template type from Customfields and after the publish is finnished the desired project template will be created in the project server 2007. You can have as many Templates as you want. To be able to use this feature, you or your EPM partner will need to create different templates, then register them.
Here are some key features of "MS Project Tool 2007 Addin":
· Creating project webspace from list of templates from your project professional.
· Delete projects from server.
· Delete a wrokspace from project and recreate it.
· Add/Remove project Summary from your projects
· Delete Project Workspaces.
· Bulk Checkin/Checkout multible projects.
· OpenSmart: Search through many projects by Test filter so you can get a better visibility and then open your project.
· Inconsistency check between Task Actual Work hours/ Task Actual Work hours protected/PWA work.
· Inconsistency chech between Task Actual Work hours/ Resources Actual Work hours.
· Inconsistency chech between Project Professional 2007 Task Actual Work hours/Project Professional 2007 Timescale Actual Work hours/ Project Server timesheet.
· Alert When deleting Task/assignment/ressources from your project when Actualwork is pending in Project Web Access Timesheet, (Integrated external timesheet)
Requirements:
· MS project 2007 client connected to Ms project 2007 server.
· Microsoft Visual Studio 2007 Tools for Office Second Edition Runtime(Is install pack)