Gantt Designer Changelog

What's new in Gantt Designer 2.0.3753.34446

May 28, 2015
  • Fixed:
  • File Exit
  • Some rolled-up task issues
  • Added:
  • Registration
  • Automatic check for updates
  • Removed: Expiry date

New in Gantt Designer 2.0.3740.22385 (May 28, 2015)

  • Added:
  • Warning for pre-.NET 2.0 SP1
  • Make bars same row using right click
  • Drag and drop (first) attached file from Outlook
  • Copy and paste time bar properties
  • Fixed:
  • Percentage bar has wrong length
  • Worked around:
  • Abend for some users on startup

New in Gantt Designer 2.0.3714.28715 (May 28, 2015)

  • Unfixed:
  • File dialogs still do not work pre-.NET 2.0 SP1
  • Fixed:
  • Right click time bar Bar details do nothing
  • Multiple-page Print to printer abends
  • Percentage completed property not saved
  • Enter key on last line does not create new blank task
  • Multiple bars on same row disappear after new row added at bottom
  • Time scale in patches of white when printing sometimes

New in Gantt Designer 2.0.3710.37421 (May 28, 2015)

  • Fixed:
  • Del key deletes highlighted row/column instead of selected text (but no Undo)
  • Splitter gets moved when chart is minimized
  • Multiple bars on same row errors
  • File dialogs do not work pre-.NET 2.0 SP1>
  • Bar text inside property not saved
  • Calendar abend when no chart is opened
  • Added:
  • Help About shows .NET Framework versions

New in Gantt Designer 2.0.3707.39292 Beta (Feb 26, 2010)

  • Fixed: Indent abend in some non-English locales
  • Fixed: Multiple bars on same row are not saved
  • Fixed: Print to image file checks for existing file

New in Gantt Designer 2.0.3702.28951 (Feb 26, 2010)

  • Fixed: Saving unnamed chart numbering error
  • Fixed: Working days based on a per chart and not global
  • Added: Option to set default working days for new charts
  • Added: More translation files

New in Gantt Designer 2.0.3700.31612 (Feb 26, 2010)

  • Added: multiple levels of sub-tasks
  • Added: collapsing sub-tasks into a rolled-up task
  • Added: multiple predecessors
  • Added: multiple time bars per row
  • Added: copy/cut and paste rows
  • Added: copy/cut and paste columns
  • Added: open Microsoft Project files
  • Added: read holidays from Outlook calendar
  • Added: Undo/Redo
  • Added: computing start date from duration and manually entered finish date
  • Added: annontation in center of time bar
  • Added: display in years
  • Added: paste columns or rows into Excel/Word/ et cetera
  • Added: cost, in specified currency per chart
  • Added: MDI - multiple charts per session
  • Added: move all tasks forward by some days
  • Added: user configured default row height
  • Added: four more (total five) free-text columns
  • Added: User-configurable padding for cells
  • Fixed: writing of temporary files in Vista and Windows 7

New in Gantt Designer 1.0.2771 (Aug 7, 2009)

  • Fixed: Abend when moving rows.
  • Fixed: Finish date computation method.
  • Added: Fit printing into multiple pages.
  • Added: Preview button in Print dialog.

New in Gantt Designer 1.0.2612 (Aug 7, 2009)

  • Updated: File format is now 1.01.
  • Added: Auto-increment of chart Earliest/Latest dates when scrollbar hits end
  • Added: Week numbers
  • Added: Month, week, day counting from a reference date
  • Added: Switch on/off horizontal lines
  • Fixed: Chart Latest date changes when day column width is reduced
  • Fixed: Chart Earliest date can be later than Chart Latest date
  • Fixed: Printing Start row can be higher than end row
  • Fixed: Printing Start date can be earlier than end date
  • Added: More information in Help About
  • Fixed: Printing beyond chart Earliest/Latest dates