Hydrologic Risk Changelog

What's new in Hydrologic Risk 2011.9.0.320

Apr 1, 2013
  • Section direction individuation. The direction must always be the same in order to correctly draw the flooding map
  • New command to modify sections: allows plan section displacements. Direction can be changed by right clicking the section. Attention: the sections must always have the same direction
  • Riverbed sections from DXF
  • New command in View menu – ONLY hydrologic network