What's new in JAST Another Scrum Tool Portable 1.5 Beta

Sep 22, 2016
  • Bug fix:
  • Update release description in releases view
  • Correct predicted line in the product burndown chart
  • Null Pointer Exceptions (NPE) thrown in JAWS:
  • Show sprint statistics
  • Costs
  • Sprint backlog
  • Calculate done task time if no working units are set
  • Filtering tasks
  • Changes:
  • Order of the topic and epic in the backlog dialog changed
  • Set font size in the text panes to 16
  • Show error dialog if a product file could not be opened

New in JAST Another Scrum Tool Portable 1.4 Beta (Sep 23, 2014)

  • Bug fix:
  • Update of Gannt chart after task and backlog updates
  • Show appointments in week view correctly if Saturdays or Sundays are faded out
  • Convert invalid estimation values to 0
  • Task
  • Backlog item
  • Cost value
  • Open English manual via menu bar in portable version
  • Correct path to HTML manual

New in JAST Another Scrum Tool Portable 1.3 Beta (Aug 25, 2014)

  • New features:
  • English handbook and help files integrated
  • Bug fix:
  • NullPointerException on clicking in task overview table

New in JAST Another Scrum Tool Portable 1.2 Beta (Apr 24, 2014)

  • New features:
  • New markup for
  • Tables
  • Horizontal lines
  • HTML preview in text area panes
  • Changes:
  • Show epics in requirements only if backlog items contains requirements
  • Hide and show single columns in several tables
  • Bug fix:
  • NullPointerException on double sided print of task cards
  • Remove automatically non valid no working days after changing sprint start or end

New in JAST Another Scrum Tool Portable 1.1 Beta (Dec 30, 2013)

  • New features:
  • Formating of reports for mono space and bold text added
  • Team charter added
  • Release management added
  • Changes:
  • Bug fix:
  • Include backlog item estimations in product statistic
  • Bold text at the beginning of a line (LaTeX, PDF)
  • Replacements in program listings (LaTeX, PDF)
  • Completion in product statistic table

New in JAST Another Scrum Tool Portable 1.0.1272 Beta (May 10, 2013)

  • New features:
  • Set login name, password and admin
  • Show current sprint tasks in product backlog tree
  • Add attachments to tasks
  • Delete all backlog items
  • Manage web users
  • Create pinboard task cards
  • Changes:
  • Show backlog item topic in sprint backlog table
  • Suggest sprint title as file name for sprint LaTeX/PDF reports
  • Bug fix:
  • Undo remove member: Restore assigned tasks
  • Total time value of not assigned member in product statistic table
  • Store removed items if updating product in database
  • NullPointerException when removing last sprint in sprint view
  • After deleting cost category delete it from the assigned users
  • Date of new appointment in week view

New in JAST Another Scrum Tool Portable 0.9.0.1132 Beta (Jan 9, 2013)

  • New features:
  • Epic pie charts
  • Current time done
  • Current time to do
  • Original time to do
  • Hide done tasks and backlog items in product backlog tree
  • Handbook in epub format added
  • Copy epics, backlog items and tasks
  • Change backlog items priority via +/- keys in tree
  • Spell checking added
  • Delete selected tasks in the task overview manager
  • Changes:
  • Keep selection of task and backlog item after clearing backlog tree filter
  • Original to do and current done field added in product statistic panel
  • Handbook changed from LaTeX to DocBook
  • Insert new impediment and new sprint by key press of Insert key
  • Show only users that have tasks in the sprint user panel
  • After deleting task in tree select the previous task
  • Import and export epic title via Open Office
  • Set appointment title with name of appointment type
  • Auto complete of the end date of a full time appointment
  • Restore state of task overview, sprint manager, impediment and planning panel
  • Scroll to selected item after hide/show done tasks
  • Show flags in language menu
  • Show other icon in tree if product is expanded
  • Log hibernate log entries from log level WARN or higher
  • Table filter added
  • Team table
  • Budget table
  • Appointment table
  • Show unassigned tasks in
  • Product statistic
  • Sprint statistic
  • Bug fix:
  • Remove cost category after deleting all cost categories
  • Show handbook and HTML help when blanks are in the path
  • Calculate costs to todo of a member in product statistic table
  • Update product statistic table after changing members cost category
  • Singleton Bugzilla window
  • Keep tree state of backlog item tree after changing priority, topic or epic title
  • While navigation with cursor up and cursor down the focus stays in the tree
  • Update backlog item estimation when chaning task estimation if automatic update is on
  • Update epic in tree after changing it
  • Select correct task after double click in sprint overview or task overview
  • Translate languages menu items after changing language
  • Tree update after inserting new task in filtered product backlog tree
  • Prevent storing inconsistent products in database
  • Select new added sprint in sprint list
  • Empty sprint title and already existing sprint title can not be set in sprint title textfield
  • Navigation with tab key in team table
  • Update of impediment title
  • Prevent setting empty product title
  • Sprint LaTeX report if task is not assigned to user
  • Expand tree after adding first backlog item
  • Update member in user panel of the sprint overview manager

New in JAST Another Scrum Tool Portable 0.8.0.937 Beta (May 18, 2012)

  • New features:
  • Member velocity chart
  • Open file via dropping it to the frame
  • Double click in user task list of sprint opens task in product backlog
  • Default values for:
  • Product name
  • Epic name
  • Backlog item topic
  • Task title
  • Sprint title
  • Impediment title
  • Sprint duration in days
  • Maximum priority
  • Tasks of the current sprint are emphasized in the backlog tree
  • Epic statistic panel
  • Double click in task overview table opens task in product backlog
  • Filter table content
  • Task overview
  • Sprint task table
  • Bugzilla panel
  • Working unit weeks added
  • Statusbar stores message history
  • Filter product backlog tree
  • Automatic working unit conversion
  • Restore last selected task and member in the sprint manager member tab
  • Restore last selected task in task overview table
  • Push buttons show which view is displayed
  • Delete last opened files
  • Delete epic and associated backlog items
  • Appointment table in the planning manager
  • Member attribute color added
  • Generate pdf reports with pdflatex
  • Changes:
  • Navigate via double click from sprint task overview to product backlog
  • Show average value in sprint velocity diagram
  • Show epic in tool tip of the user panel in the sprint manager
  • Impediments:
  • Add current date
  • Select reporter by combobox
  • Show done symbol for finshed epics
  • Show normalised average line in sprint velocity diagram
  • Show current sprint in other color in sprint manager no working days panel
  • Show predicted burn down line in product burn down chart
  • Select first product in database panel
  • Tool tips to charts added
  • Show task's symbol in backlog tree according to its state
  • Show done value in product burndown chart
  • Today button in sprint no working day panel added
  • Today button in planning week view added
  • Choice dialog for saving product and terminating application
  • pdflatex path is editable in order to use relative paths
  • On Windows system set look and feel automatically to Windows look and feel
  • Preference dialog can only displayed once
  • Mark current sprint with sprint in menu item:
  • Sprint diagrams
  • Sprint estimation reports
  • LaTeX sprint reports
  • Restore the last selected tab in the preference dialog
  • Show todo and done in pinboard note
  • Tasks sorted independent of lower and upper case
  • First sprint of a product starts today
  • Sort reopened files according to the time of last opening it
  • Switch in edit mode when adding a new team member
  • It is possible to unset the priority of a backlog item
  • Sprint title must be unique and have at least one character
  • Second and third level of itemization in LaTeX generation
  • Linear color gradient in completion columns
  • Apply button in options dialog added
  • Table of tasks in sprint users tab
  • Show log events prior to first call of log view window
  • Bug fix:
  • Description of task is editable after done task is selected
  • Show correct sprint velocity in sprint velocity diagram
  • NullPointerException: Drop file in product backlog tree.
  • Backlog tree repaint after drag & drop task.
  • Pinboard won't be shown if there are no current sprint with tasks
  • Restore size of option dialog
  • Calcuation of values of the product burn down chart
  • Selection after deleting backlog item or task in backlog tree
  • Show Saturdays and Sundays in the week view
  • Show backlog item panel after inserting it
  • File planing.xml renamed as planning.xml
  • Calcualtion of normalized average member velocity
  • Update task table in sprint manager
  • Update reopen file list after opening a file
  • Save task estimation value after selecting other item in backlog tree
  • Saving of read-only files
  • Show product burndown chart when product contains sprint with no working days
  • Select correct tasks in sprint estimation report
  • Show tasks in pinboard that have no member
  • Show correct priority in backlog panel
  • Show correct unit in product panel

New in JAST Another Scrum Tool Portable 0.5.2.388 Beta (Jul 25, 2011)

  • Bug fix:
  • If a task is marked as done the remaining todo time
  • New features:
  • In the following text input field are URLs highlighted and can be clicked:
  • Product: Description
  • Backlog item: Description, acceptance, requirements
  • Sprint: Description, goals
  • Task: Description
  • Impediment: Description
  • Sprint Estimation Report added.
  • Bugzilla connection.
  • Changes:
  • Refactoring dependencies.
  • Scroll to top when showing information dialog.
  • Navigation in planning table implemented as in working unit table.
  • Show time in tool tip in the task overview table.
  • Bug fix:
  • In the installed version can reports shown because they are generated in the temp folder.
  • If no product is open the diagram and the view menu won't be enabled.
  • Show updated arithmetic expression in backlog item and task estimation textfield.
  • Calculate costs in task overview table tool tip correct after sorting table.
  • If you try to rename a backlog item or a task in tree view to an already existing title the
  • original title will be restored.
  • No dialog message box after canceling deletion of backlog item.
  • Values in the to do and done columns of the working unit table can be removed.s now 0.

New in JAST Another Scrum Tool Portable 0.5.1 (Jul 25, 2011)

  • Bug fix:
  • If a task is marked as done the remaining todo time is now 0.

New in JAST Another Scrum Tool Portable 0.5.0.320 (May 30, 2011)

  • New features:
  • Update checkbox in the product panel added in order to recalculate
  • the estimated time.
  • Create reports
  • Product Backlog Report
  • The title of the product, backlog items and tasks are editable in the tree.
  • Database connection
  • Supported databases: HSQLDB, H2, MySQL and PostgreSQL.
  • Storing products in databases.
  • Simple arithmetic expression can be calculated in
  • the estimation field of a backlog item,
  • the estimation field of a task,
  • in the planing table and
  • in the working day table of the user.
  • Gannt chart of the sprints.
  • Changes:
  • In the Sprint view the in tab Users there are only the tasks listed that
  • belong to the sprint.
  • New order of the log levels: ALL, TRACE, DEBUG, INFO, WARN, ERROR, FATAL, OFF.
  • Backlog items must have an unique topic.
  • The titles of the tasks of the same backlog item must be unique.
  • Show unit in column headers for time to do and time done.
  • Fields for team name and team description removed.
  • If you insert a new backlog item or a new task the new backlog item or the
  • new task will be selected in the tree.
  • Backlog items with no task can be exported and imported.
  • Selection in the tree of the backlog item panel remains.
  • The content of the following textfields is selected after gaining the focus:
  • Product: Title and product owner.
  • Backlog item: Topic and estimation.
  • Task: Title and estimation.
  • Sprint: Title.
  • Impediment: Title and reported by.
  • Costs: Budget.
  • Column with the planned time in the working unit table.
  • Backlog items and tasks can be inserted in the backlog item tree via
  • the key INSERT.
  • Show in version dialog window the readme, history and license file, too.
  • Confirmation dialog in installer before overwriting configuration files and
  • report templates.
  • In the working unit table are all not editable fields painted with a gray
  • background color.
  • Show times done, times to do and total time of the members in the product
  • statistic panel.
  • Show in sprint task table the backlogitem topic in the tooltip.
  • Bug fix:
  • If the task is finished on the first day of the sprint the time calculation
  • for the sprint chart has been corrected.
  • The vertical scroll bar will be shown in the product backlog tree and the
  • sprint tree.
  • Task can be removed immediately from a backlog item.
  • Last day of sprint is shown in the user task overview.
  • After an opened scenario is saved and new scenario is created, the save action
  • doesn't override the before opened scenario.
  • In the sprint burn down chart is the last sprint day shown.
  • If one backlog item with the same name is more than one times in the file now it
  • can be removed.
  • Set the correct locale of the the sprint begin and end date and the no working days.
  • Show in the sprint panel in the user tab the working unit table if a task is selected.
  • In a backlog item there cannot be two or more task with the equals titles.
  • Show product backlog chart and sprint charts if a user has not set the time to do
  • in the working unit table.
  • Correct calculation of the actual costs of a member per sprint for the costs chart.
  • Update working unit table after changing selection in task list.
  • The readme, history and license file to the installer added.
  • If a used cost category is removed the product statistic can be calculated.
  • Overlapping sprint planning isn't possible anymore.

New in JAST Another Scrum Tool Portable 0.3 (May 30, 2011)

  • New features:
  • Status bar added
  • Manage impediments
  • Reopen already opened files
  • OpenOffice export and import of the product backlog
  • Insert Members from Office / OpenOffice
  • Team table
  • Insert pinboard
  • Bug fix:
  • If the last sprint is deleted an empty panel will be displayed.

New in JAST Another Scrum Tool Portable 0.2 (May 30, 2011)

  • Manage Scrum products
  • Generate burndown charts
  • Manage product costs