What's new in JAST Another Scrum Tool Portable 1.5 Beta
Sep 22, 2016
- Bug fix:
- Update release description in releases view
- Correct predicted line in the product burndown chart
- Null Pointer Exceptions (NPE) thrown in JAWS:
- Show sprint statistics
- Costs
- Sprint backlog
- Calculate done task time if no working units are set
- Filtering tasks
- Changes:
- Order of the topic and epic in the backlog dialog changed
- Set font size in the text panes to 16
- Show error dialog if a product file could not be opened
New in JAST Another Scrum Tool Portable 1.4 Beta (Sep 23, 2014)
- Bug fix:
- Update of Gannt chart after task and backlog updates
- Show appointments in week view correctly if Saturdays or Sundays are faded out
- Convert invalid estimation values to 0
- Task
- Backlog item
- Cost value
- Open English manual via menu bar in portable version
- Correct path to HTML manual
New in JAST Another Scrum Tool Portable 1.3 Beta (Aug 25, 2014)
- New features:
- English handbook and help files integrated
- Bug fix:
- NullPointerException on clicking in task overview table
New in JAST Another Scrum Tool Portable 1.2 Beta (Apr 24, 2014)
- New features:
- New markup for
- Tables
- Horizontal lines
- HTML preview in text area panes
- Changes:
- Show epics in requirements only if backlog items contains requirements
- Hide and show single columns in several tables
- Bug fix:
- NullPointerException on double sided print of task cards
- Remove automatically non valid no working days after changing sprint start or end
New in JAST Another Scrum Tool Portable 1.1 Beta (Dec 30, 2013)
- New features:
- Formating of reports for mono space and bold text added
- Team charter added
- Release management added
- Changes:
- Bug fix:
- Include backlog item estimations in product statistic
- Bold text at the beginning of a line (LaTeX, PDF)
- Replacements in program listings (LaTeX, PDF)
- Completion in product statistic table
New in JAST Another Scrum Tool Portable 1.0.1272 Beta (May 10, 2013)
- New features:
- Set login name, password and admin
- Show current sprint tasks in product backlog tree
- Add attachments to tasks
- Delete all backlog items
- Manage web users
- Create pinboard task cards
- Changes:
- Show backlog item topic in sprint backlog table
- Suggest sprint title as file name for sprint LaTeX/PDF reports
- Bug fix:
- Undo remove member: Restore assigned tasks
- Total time value of not assigned member in product statistic table
- Store removed items if updating product in database
- NullPointerException when removing last sprint in sprint view
- After deleting cost category delete it from the assigned users
- Date of new appointment in week view
New in JAST Another Scrum Tool Portable 0.9.0.1132 Beta (Jan 9, 2013)
- New features:
- Epic pie charts
- Current time done
- Current time to do
- Original time to do
- Hide done tasks and backlog items in product backlog tree
- Handbook in epub format added
- Copy epics, backlog items and tasks
- Change backlog items priority via +/- keys in tree
- Spell checking added
- Delete selected tasks in the task overview manager
- Changes:
- Keep selection of task and backlog item after clearing backlog tree filter
- Original to do and current done field added in product statistic panel
- Handbook changed from LaTeX to DocBook
- Insert new impediment and new sprint by key press of Insert key
- Show only users that have tasks in the sprint user panel
- After deleting task in tree select the previous task
- Import and export epic title via Open Office
- Set appointment title with name of appointment type
- Auto complete of the end date of a full time appointment
- Restore state of task overview, sprint manager, impediment and planning panel
- Scroll to selected item after hide/show done tasks
- Show flags in language menu
- Show other icon in tree if product is expanded
- Log hibernate log entries from log level WARN or higher
- Table filter added
- Team table
- Budget table
- Appointment table
- Show unassigned tasks in
- Product statistic
- Sprint statistic
- Bug fix:
- Remove cost category after deleting all cost categories
- Show handbook and HTML help when blanks are in the path
- Calculate costs to todo of a member in product statistic table
- Update product statistic table after changing members cost category
- Singleton Bugzilla window
- Keep tree state of backlog item tree after changing priority, topic or epic title
- While navigation with cursor up and cursor down the focus stays in the tree
- Update backlog item estimation when chaning task estimation if automatic update is on
- Update epic in tree after changing it
- Select correct task after double click in sprint overview or task overview
- Translate languages menu items after changing language
- Tree update after inserting new task in filtered product backlog tree
- Prevent storing inconsistent products in database
- Select new added sprint in sprint list
- Empty sprint title and already existing sprint title can not be set in sprint title textfield
- Navigation with tab key in team table
- Update of impediment title
- Prevent setting empty product title
- Sprint LaTeX report if task is not assigned to user
- Expand tree after adding first backlog item
- Update member in user panel of the sprint overview manager
New in JAST Another Scrum Tool Portable 0.8.0.937 Beta (May 18, 2012)
- New features:
- Member velocity chart
- Open file via dropping it to the frame
- Double click in user task list of sprint opens task in product backlog
- Default values for:
- Product name
- Epic name
- Backlog item topic
- Task title
- Sprint title
- Impediment title
- Sprint duration in days
- Maximum priority
- Tasks of the current sprint are emphasized in the backlog tree
- Epic statistic panel
- Double click in task overview table opens task in product backlog
- Filter table content
- Task overview
- Sprint task table
- Bugzilla panel
- Working unit weeks added
- Statusbar stores message history
- Filter product backlog tree
- Automatic working unit conversion
- Restore last selected task and member in the sprint manager member tab
- Restore last selected task in task overview table
- Push buttons show which view is displayed
- Delete last opened files
- Delete epic and associated backlog items
- Appointment table in the planning manager
- Member attribute color added
- Generate pdf reports with pdflatex
- Changes:
- Navigate via double click from sprint task overview to product backlog
- Show average value in sprint velocity diagram
- Show epic in tool tip of the user panel in the sprint manager
- Impediments:
- Add current date
- Select reporter by combobox
- Show done symbol for finshed epics
- Show normalised average line in sprint velocity diagram
- Show current sprint in other color in sprint manager no working days panel
- Show predicted burn down line in product burn down chart
- Select first product in database panel
- Tool tips to charts added
- Show task's symbol in backlog tree according to its state
- Show done value in product burndown chart
- Today button in sprint no working day panel added
- Today button in planning week view added
- Choice dialog for saving product and terminating application
- pdflatex path is editable in order to use relative paths
- On Windows system set look and feel automatically to Windows look and feel
- Preference dialog can only displayed once
- Mark current sprint with sprint in menu item:
- Sprint diagrams
- Sprint estimation reports
- LaTeX sprint reports
- Restore the last selected tab in the preference dialog
- Show todo and done in pinboard note
- Tasks sorted independent of lower and upper case
- First sprint of a product starts today
- Sort reopened files according to the time of last opening it
- Switch in edit mode when adding a new team member
- It is possible to unset the priority of a backlog item
- Sprint title must be unique and have at least one character
- Second and third level of itemization in LaTeX generation
- Linear color gradient in completion columns
- Apply button in options dialog added
- Table of tasks in sprint users tab
- Show log events prior to first call of log view window
- Bug fix:
- Description of task is editable after done task is selected
- Show correct sprint velocity in sprint velocity diagram
- NullPointerException: Drop file in product backlog tree.
- Backlog tree repaint after drag & drop task.
- Pinboard won't be shown if there are no current sprint with tasks
- Restore size of option dialog
- Calcuation of values of the product burn down chart
- Selection after deleting backlog item or task in backlog tree
- Show Saturdays and Sundays in the week view
- Show backlog item panel after inserting it
- File planing.xml renamed as planning.xml
- Calcualtion of normalized average member velocity
- Update task table in sprint manager
- Update reopen file list after opening a file
- Save task estimation value after selecting other item in backlog tree
- Saving of read-only files
- Show product burndown chart when product contains sprint with no working days
- Select correct tasks in sprint estimation report
- Show tasks in pinboard that have no member
- Show correct priority in backlog panel
- Show correct unit in product panel
New in JAST Another Scrum Tool Portable 0.5.2.388 Beta (Jul 25, 2011)
- Bug fix:
- If a task is marked as done the remaining todo time
- New features:
- In the following text input field are URLs highlighted and can be clicked:
- Product: Description
- Backlog item: Description, acceptance, requirements
- Sprint: Description, goals
- Task: Description
- Impediment: Description
- Sprint Estimation Report added.
- Bugzilla connection.
- Changes:
- Refactoring dependencies.
- Scroll to top when showing information dialog.
- Navigation in planning table implemented as in working unit table.
- Show time in tool tip in the task overview table.
- Bug fix:
- In the installed version can reports shown because they are generated in the temp folder.
- If no product is open the diagram and the view menu won't be enabled.
- Show updated arithmetic expression in backlog item and task estimation textfield.
- Calculate costs in task overview table tool tip correct after sorting table.
- If you try to rename a backlog item or a task in tree view to an already existing title the
- original title will be restored.
- No dialog message box after canceling deletion of backlog item.
- Values in the to do and done columns of the working unit table can be removed.s now 0.
New in JAST Another Scrum Tool Portable 0.5.1 (Jul 25, 2011)
- Bug fix:
- If a task is marked as done the remaining todo time is now 0.
New in JAST Another Scrum Tool Portable 0.5.0.320 (May 30, 2011)
- New features:
- Update checkbox in the product panel added in order to recalculate
- the estimated time.
- Create reports
- Product Backlog Report
- The title of the product, backlog items and tasks are editable in the tree.
- Database connection
- Supported databases: HSQLDB, H2, MySQL and PostgreSQL.
- Storing products in databases.
- Simple arithmetic expression can be calculated in
- the estimation field of a backlog item,
- the estimation field of a task,
- in the planing table and
- in the working day table of the user.
- Gannt chart of the sprints.
- Changes:
- In the Sprint view the in tab Users there are only the tasks listed that
- belong to the sprint.
- New order of the log levels: ALL, TRACE, DEBUG, INFO, WARN, ERROR, FATAL, OFF.
- Backlog items must have an unique topic.
- The titles of the tasks of the same backlog item must be unique.
- Show unit in column headers for time to do and time done.
- Fields for team name and team description removed.
- If you insert a new backlog item or a new task the new backlog item or the
- new task will be selected in the tree.
- Backlog items with no task can be exported and imported.
- Selection in the tree of the backlog item panel remains.
- The content of the following textfields is selected after gaining the focus:
- Product: Title and product owner.
- Backlog item: Topic and estimation.
- Task: Title and estimation.
- Sprint: Title.
- Impediment: Title and reported by.
- Costs: Budget.
- Column with the planned time in the working unit table.
- Backlog items and tasks can be inserted in the backlog item tree via
- the key INSERT.
- Show in version dialog window the readme, history and license file, too.
- Confirmation dialog in installer before overwriting configuration files and
- report templates.
- In the working unit table are all not editable fields painted with a gray
- background color.
- Show times done, times to do and total time of the members in the product
- statistic panel.
- Show in sprint task table the backlogitem topic in the tooltip.
- Bug fix:
- If the task is finished on the first day of the sprint the time calculation
- for the sprint chart has been corrected.
- The vertical scroll bar will be shown in the product backlog tree and the
- sprint tree.
- Task can be removed immediately from a backlog item.
- Last day of sprint is shown in the user task overview.
- After an opened scenario is saved and new scenario is created, the save action
- doesn't override the before opened scenario.
- In the sprint burn down chart is the last sprint day shown.
- If one backlog item with the same name is more than one times in the file now it
- can be removed.
- Set the correct locale of the the sprint begin and end date and the no working days.
- Show in the sprint panel in the user tab the working unit table if a task is selected.
- In a backlog item there cannot be two or more task with the equals titles.
- Show product backlog chart and sprint charts if a user has not set the time to do
- in the working unit table.
- Correct calculation of the actual costs of a member per sprint for the costs chart.
- Update working unit table after changing selection in task list.
- The readme, history and license file to the installer added.
- If a used cost category is removed the product statistic can be calculated.
- Overlapping sprint planning isn't possible anymore.
New in JAST Another Scrum Tool Portable 0.3 (May 30, 2011)
- New features:
- Status bar added
- Manage impediments
- Reopen already opened files
- OpenOffice export and import of the product backlog
- Insert Members from Office / OpenOffice
- Team table
- Insert pinboard
- Bug fix:
- If the last sprint is deleted an empty panel will be displayed.
New in JAST Another Scrum Tool Portable 0.2 (May 30, 2011)
- Manage Scrum products
- Generate burndown charts
- Manage product costs