PeopleRes Data Manager Changelog

What's new in PeopleRes Data Manager 1.2.0.0

Jul 8, 2013
  • Fixed performance issues when exporting large amounts of data to CSV, Excel and Generating SQL Statements
  • Testing performance on a sheet with 121662 rows and 16 columns:
  • CSV export in 2 seconds (24.7mb)
  • XML export in 3 seconds (76mb)
  • SQL INSERT statements generated in 5 seconds (56.4mb)
  • Excel 2010 in 25 seconds (9mb)
  • Added support to export to XML (individual sheet or whole project)
  • When attempting to display more than 500 generated SQL statements, a warning will display and recommend rather writing directly to file
  • When exporting to Excel, the blank column on the left used for selecting and dragging rows, won’t be included in the export. Data will thus begin in column A.
  • Data Source can now be selected directly on the Data Sheet Editor. The Build popup window is now optional.
  • When copying a sheet, the Data Sheet Editor will automatically open for the newly created sheet
  • It is now possible to create a new project directly from an Excel Workbook or XML file. All the tabs / tables will automatically be imported:
  • The program can also be started with one of these file types as parameter. (i.e. drag an Excel file and drop it on the PRDataManager’s icon)