What's new in Steelray Project Analyzer 7.17.4

Apr 19, 2024
  • Bug Fix: Criteria Manager import and export fix.

New in Steelray Project Analyzer 7.17.3 (Dec 13, 2023)

  • Bug Fix: Fixed an issue where EasyLicense keys were requiring activation incorrectly.

New in Steelray Project Analyzer 7.17.2 (May 12, 2023)

  • Bug Fix: In some cases, saving modified criterion was throwing an error.

New in Steelray Project Analyzer 7.17.0 (Feb 27, 2023)

  • Improvement: Upgraded to latest release of third-party libraries.
  • Bug Fix: Corrected an error when analyzing schedules that utilize the MPXJ project platform.

New in Steelray Project Analyzer 7.16.0 (Feb 8, 2023)

  • Improvement: Upgraded to latest release of third-party libraries.
  • Bug Fix: Missing dates corrected to display "NA" in Excel Scorecard output.

New in Steelray Project Analyzer 7.15.1 (Jan 14, 2023)

  • Updated code signing certificate for installer.
  • Bug Fix: Missing Microsoft Project filter was reporting an exception; the application will now notify the user about the missing filter.

New in Steelray Project Analyzer 7.15.0 (Jan 3, 2023)

  • With this release, Project Analyzer supports the Microsoft Project platform only. Primavera schedule health analysis is available in our Analyzer for P6 product.
  • Improvement: Better handling of manually scheduled tasks in Longest Path report.
  • Bug Fix: Corrected issue when adding multiple projects to the application.
  • Bug Fix: Corrected issues with Global Scorecard report scoring and display.

New in Steelray Project Analyzer 7.14.0 (Nov 18, 2022)

  • Improvement: Excel Scorecard report includes metric description on Summary tab.
  • Bug Fix: Excel Scorecard report bug fixed.
  • Bug Fix: Restored Check for Updates in Help menu.
  • Bug Fix: Reset Criteria and Reports bug fixed.

New in Steelray Project Analyzer 7.13.0 (Oct 21, 2022)

  • Improvement: Upgraded to latest release of third-party libraries.
  • Bug Fix: Intermittent issue with Scorecard renderer when multiple outputs selected.

New in Steelray Project Analyzer 7.12.0 (Aug 18, 2022)

  • Improvement: Improve support for schedule comparison reports.

New in Steelray Project Analyzer 7.11.2 (May 18, 2022)

  • Bug Fix:
  • DECM metric checks corrected to disregard LOE designation, unless explicitly noted in the test metric specification (as with 06A204b and 06A210a).

New in Steelray Project Analyzer 7.11.1 (Apr 19, 2022)

  • Bug Fix: DECM metric 06A212a corrected to run on all tasks, including complete.
  • Bug Fix: DECM metric 06A504a and 06A504b corrected to ignore time of day when comparing dates.
  • Bug Fix: DECM metric 06A506b corrected to check forecast finish dates for all incomplete tasks.

New in Steelray Project Analyzer 7.11.0 (Apr 8, 2022)

  • Primavera functionality removed from the user interface in preparation for its phase-out.

New in Steelray Project Analyzer 7.10.1 (Mar 17, 2022)

  • Bug Fix: Corrected displayed score value for DECM check 06A504b.

New in Steelray Project Analyzer 7.10.0 (Mar 15, 2022)

  • Bug Fix: Score Comparison Excel report links from the summary page to the detail tabs were not working.
  • Improvement: Formatted criteria scores in various reports to clearly indicate where the value is a percentage.
  • Improvement: Project Online schedules are opened with Read-Only permissions to prevent a conflict when the schedule is checked out.

New in Steelray Project Analyzer 7.9.0 (Feb 4, 2022)

  • Improvement: Implemented support for DECM 5.0 changes.

New in Steelray Project Analyzer 7.8.2 (Dec 29, 2021)

  • Bug Fix: Corrected issue with diagnostic reporting.

New in Steelray Project Analyzer 7.7.2 (Oct 21, 2021)

  • Bug Fix: Several schedule comparison report fixes for XER schedules.

New in Steelray Project Analyzer 7.7.1 (Oct 18, 2021)

  • Bug Fix: T
  • hird-party library update caused issues with Excel report output.
  • Improvement:
  • Upgraded to latest release of third-party libraries.
  • Bug Fix: Corrected Excel output from the Dynamic Schedule Compare report for XER schedules.

New in Steelray Project Analyzer 7.6.2 (Jun 21, 2021)

  • Bug Fix:
  • Export and import of Dynamic Schedule Compare report fixed.
  • Viewing matched tasks from XER files containing multiple schedules was not working. For Viewer customers, this fix requires installing version 6.4.2 or newer.

New in Steelray Project Analyzer 7.6.1 (May 18, 2021)

  • Bug Fix: Printing from the Dynamic Schedule Compare report was generating an error.
  • Improvements and Fixes: Dynamic Schedule Compare report export to Excel now displays time units in hours.

New in Steelray Project Analyzer 7.6.0 (May 4, 2021)

  • Removed obsolete or unused features, including:
  • Tree Map Scorecard report
  • Grouped Bar Chart report
  • Improvement: Updated dialog for adding XER schedules to a Project Set.
  • Bug Fix: Not selecting items in Dynamic Schedule Compare reports was causing an error.
  • Bug Fix: In rare cases, export of the Dynamic Schedule Compare report to Excel was causing an error.
  • Bug Fix: Viewing matched tasks from an XER schedule in Viewer was not working. For Viewer customers, this fix requires installing version 6.4.0 or newer.

New in Steelray Project Analyzer 7.5.0 (Apr 2, 2021)

  • Removed obsolete or unused features, including:
  • Unused menu item for printing
  • Circular Chains report
  • UN/CEFACT XML support
  • Bug Fix:
  • Status Date was not properly displayed in 14 Point Assessment reports.

New in Steelray Project Analyzer 7.4.3 (Mar 19, 2021)

  • Bug Fix: User settings causing application to hang in some secure environments

New in Steelray Project Analyzer 7.4.2 (Feb 12, 2021)

  • Bug Fix: Updated code signing certificate for installer.

New in Steelray Project Analyzer 7.4.1 (Feb 2, 2021)

  • Bug Fix: MPXJ project read error, linked to wrong assembly version reference.

New in Steelray Project Analyzer 7.4.0 (Feb 2, 2021)

  • Improvement: Added link to video tutorials on Help menu.
  • Bug Fix: Total Tasks in XER schedules were not correctly identified for DCMA 14 Point reports.

New in Steelray Project Analyzer 7.3.0 (Feb 2, 2021)

  • Improvement: Upgraded to latest release of third-party libraries.
  • Bug Fix: In Excel Scorecard, some results were displayed in minutes instead of days.
  • Bug Fix: On the Project Properties page for XER project sets, XER schedules were listed in red font.

New in Steelray Project Analyzer 2020.11.54 (Nov 20, 2020)

  • Bug Fix: DECM report unable to calculate certain metrics when no tasks have actual start or actual finish dates set.

New in Steelray Project Analyzer 2020.11.53 (Nov 19, 2020)

  • Improvement: Upgraded to latest release of third-party libraries.
  • Bug Fix: Fixed issue where .mpp file missing the Gantt Chart table was not exporting.
  • Improvement: Implemented support for DECM 3.6.1 changes.

New in Steelray Project Analyzer 2020.05.51 (May 16, 2020)

  • Bug Fix: Fixed problem with MPXJ provider and Project 2010.
  • Bug Fix: Updated add-in to correct issue with viewing matched tasks for some mpp's.

New in Steelray Project Analyzer 2020.05.50 (May 11, 2020)

  • Bug Fix: Fixed problem where dangling tasks could be improperly flagged in XER files.

New in Steelray Project Analyzer 2020.04.48 (Apr 10, 2020)

  • Improvement: Updated to latest mpxj library, version 8.0.6.
  • Improvement: Implemented support for changes in DECM 3.5 and 3.5.1.

New in Steelray Project Analyzer 2020.01.47 (Jan 7, 2020)

  • Improvement: Upgraded to latest release of third-party libraries.

New in Steelray Project Analyzer 2019.09.42 (Sep 24, 2019)

  • Bug Fix: Custom criterion which employ Microsoft Project filters for scoring were not correctly filtering and highlighting results from scorecard reports.
  • Bug Fix: Criterion with the grading type "No Grade" were incorrectly displaying a color gauge in the Excel Scorecard output.
  • Improvement: For better technical support, additional logging for Project Add-In calls.

New in Steelray Project Analyzer 2019.09.41 (Sep 20, 2019)

  • Bug Fix: Status and GUID fields fully supported in Filter Builder.

New in Steelray Project Analyzer 2019.09.40 (Sep 18, 2019)

  • Bug Fix: Screen maximization was shifted down.

New in Steelray Project Analyzer 2019.09.38 (Sep 6, 2019)

  • Bug Fix: On a new install, Enterprise Grouped Matrix report was displaying only as a Scorecard report.

New in Steelray Project Analyzer 2019.08.37 (Aug 16, 2019)

  • Bug Fix: Longest Path report setting to allow for showing more than one path was not working.

New in Steelray Project Analyzer 2019.6.36 (Aug 16, 2019)

  • Improvement: Made it much easier to use scorecard output targets (e.g. Excel, PowerPoint, Word, HTML).
  • Improvement: Significant design improvements to the Excel version of the scorecard.
  • Bug Fix: Increased the add-in provider timeouts to improve success on slower machines.

New in Steelray Project Analyzer 2019.6.34 (Jul 1, 2019)

  • Bug Fix: Special case where an MPP saved with a custom report visible will fail on import.
  • Improvement: The Criteria Manager, which was its own window, is now embedded into the main window.
  • Improvement: DECM 3.3 Report, updated from 3.2.

New in Steelray Project Analyzer 2019.6.33 (Jun 21, 2019)

  • Bug Fix: Filtering from an XER schedule's analysis output to Steelray Project Viewer was not always working.
  • Bug Fix: For an MPP schedule that resided on a shared network directory, Criteria 12 and 13 in the 14 Point Analysis was not working.

New in Steelray Project Analyzer 2019.5.32 (May 16, 2019)

  • Improvement: Updated DECM 3.2 Report (fka DCMA EVAS report).
  • Improvement: Added the Status column to detail tables in the GAO Excel export report.

New in Steelray Project Analyzer 2019.3.31 (Mar 26, 2019)

  • Improvement: Updated DCMA 14 Point Assessment to exclude inactive tasks.
  • Improvement: Notification added for Critical Path Length Index criterion (14 Point Assessment Report) when the project's status date is not set.
  • Bug Fix: GAO Excel export updated to exclude inactive tasks.
  • Improvement: Added Critical metric to several criterion on the Dynamic Schedule Compare report.

New in Steelray Project Analyzer 2019.3.30 (Mar 13, 2019)

  • Bug Fix: Fixed issue where inactive tasks were not being properly handled in some criteria.
  • Improvement: Numerous aesthetic improvements to the Enterprise Grouped Matrix Report.

New in Steelray Project Analyzer 2019.2.29 (Feb 5, 2019)

  • Bug Fix: Previously, when running the Hard Constraints report before any other reports resulting in output in the AppDataRoamingSteelray SoftwareSteelray Project AnalyzerDocument Output directory, the results would fail to write.
  • New Feature: Project Server providers have been renamed to reflect which version of the provider should be used with corresponding versions of Project Server.

New in Steelray Project Analyzer 2019.1.28 (Jan 25, 2019)

  • Bug Fix: Report Export feature was reporting "Error loading criteria file, export cannot continue" and not completing the export.
  • Bug Fix: New install of Analyzer will load a Scorecard report containing a few criteria.

New in Steelray Project Analyzer 2019.1.27 (Jan 15, 2019)

  • Bug Fix: The installer was missing required elements for the MPXJ Project Management Platform. This driver is used if MS Project is not installed or if the installed MS Project version is 2010 or earlier.

New in Steelray Project Analyzer 2019.1.26 (Jan 11, 2019)

  • Bug Fix: If a custom criterion used a Project Filter, and the "as a percentage of" checkbox on the Scoring tab was unchecked but pointed to a non-existent Project Filter, a report utilizing the criterion would fail.
  • Bug Fix: Steelray Add-In for Microsoft Project updated to allow for Project Filters with more than 36 rows.
  • New Feature: Unique image for XER schedules in the Projects listing.

New in Steelray Project Analyzer 2018.12.25 (Dec 15, 2018)

  • Bug fix for Primavera P6 and XER schedule id's

New in Steelray Project Analyzer 2018.12.24 (Dec 14, 2018)

  • Bug fix for SQLite Primavera P6 connections and filtering

New in Steelray Project Analyzer 2018.10.23 (Nov 28, 2018)

  • Upgraded Primavera P6 driver
  • Added support for SQLite Primavera P6 connections
  • Additional support for newer versions of Project Server

New in Steelray Project Analyzer 2018.10.22 (Oct 5, 2018)

  • SQL Server P6 configuration bug fix.
  • SQL Server P6 results filtering bug fix.
  • Documentation updates for new XER driver.
  • General performance improvements .

New in Steelray Project Analyzer 2018.9.18 (Sep 20, 2018)

  • Negative float fix for XER schedules.
  • Critical Path test fix for Project Add-In provider.
  • Date handling fix for Project Add-In provider.
  • Criteria Manager bug fix and improvements.
  • New XER driver for improved Primavera XER support:
  • Select from multiple schedules within an XER file.
  • Add XER schedules individually or as a project set.
  • XER names on Project Properties page reflect file location and schedule name.
  • XER schedules reference Activity ID as the Unique ID.

New in Steelray Project Analyzer 2018.6.20 (Jun 5, 2018)

  • Fixed bug that prevented Nextgen Project Integration driver from working with certain international versions of Windows.
  • Fixed bug where "Check for updates" was detecting an up-to-date version as out of date.

New in Steelray Project Analyzer 2018.5.19 (May 18, 2018)

  • NEW DCMA EVAS Report
  • NEW Nextgen Project Integration driver for Microsoft Project schedules
  • NEW Project Settings page
  • NEW Report Settings page
  • Improved error trapping and reporting
  • Improved help documentation
  • Improved testing and verification for Primavera P6 schedules
  • Improved context menu presentation and usability
  • Copy button fix for Scorecard and Dynamic Schedule Compare reports

New in Steelray Project Analyzer 6.1.44 Build 616 (Jan 26, 2018)

  • Excel spreadsheet non-numeric cell patch

New in Steelray Project Analyzer 6.1.42 Build 614 (Jan 11, 2018)

  • License framework patch

New in Steelray Project Analyzer 6.1.41 Build 613 (Nov 9, 2017)

  • Fixed diagnostics error
  • Fixed DCMA 14 pt error

New in Steelray Project Analyzer 6.1.38 Build 609 (Nov 8, 2017)

  • Fixed Project 2016/2010 read bug
  • Improved filtering on Project files
  • Fixed Project 2016 corruption bug
  • Added Experimental Project Driver

New in Steelray Project Analyzer 6.1.34 Build 604 (Oct 23, 2017)

  • Fixed Project 2016 corruption bug
  • Fixed license error
  • Fixed UI useability issues for various reports
  • Enhanced Grouped Matrix usability
  • Fixed MS Project COM Exception

New in Steelray Project Analyzer 5.1.2 Build 533 (May 25, 2015)

  • Fixed task flag exception when reading xer files
  • Fixed null exception within Tree Map Chart

New in Steelray Project Analyzer 5.1.0 Build 531 (May 25, 2015)

  • Version 5.1.0 of Steelray Project Analyzer contains multiple bug fixes.
  • Fixed bug regarding custom fields within MPP files that previously resulted in an error during analysis
  • Fixed minor visibility issue for scorecard settings
  • Multiple bug fixes in reading Microsoft Project 2013 files

New in Steelray Project Analyzer 5.0 Build 528 (May 25, 2015)

  • Version 5.0 of Steelray Project Analyzer introduces four new major reports.
  • Grouped Matrix Report:
  • The grouped matrix report can simply be considered a cross section of where a grouping and tasks that match a criterion intersect. Tasks are grouped by custom field entries. The custom field entries are represented along the Y-axis and the criteria along the X-axis. The number of matching tasks is an intersection of criterion and group name. This is useful for breaking out criterion results by a group when the groups are something like CAMs or cost accounts.
  • Milestone Indices Report:
  • The milestone indices look at performance and progress focusing on specific milestones. The milestone indices is an idea proposed by Bob Rodgers of TenSix Consulting. Bob and Steelray collaborated to produce this report for Steelray Project Analyzer.
  • There are two metrics in the Milestone Indices Report. The the Event Performance Indicator (EPI) and the Overall Event Performance Indicator (OEPI). The first calculation (EPI) looks at the performance of the work being done that affects this milestone. Like many indices, 1.0 is on schedule, greater than 1.0 is ahead of schedule, and less than 1.0 is behind schedule. The second calculation (OEPI) will start at 0.0 and move toward 1.0 at completion of the milestone. It can be used as a progress indicator, or alternatively an alternate measure of percent complete toward the milestone.
  • Grouped Bar Chart:
  • The Grouped Bar Chart organizes data, identified in a custom text field, horizontally and can be pivoted between group and criteria.
  • Tree Map Chart:
  • The Tree Map organizes data, identified in a custom text field, as a set of rectangles with nested rectangles identifying criteria.

New in Steelray Project Analyzer 4.2 Build 512 (May 25, 2015)

  • Version 4.2, Build 512 of Steelray Project Analyzer contains three new major features.
  • Multiple Schedule Compare:
  • Pro version users now have the ability to compare any number of schedules with this new report. Simply select your schedules in the "Projects" list, order them chronologically and click Analyze.
  • Configurable 14 Point Assessment:
  • The 14 point assessment criteria now support settings. Use the Criteria Manager to create 14 point assessment criteria that contain settings such as defining your LOE fields, what constitutes high duration or high float and more.
  • Enhanced PowerPoint Output:
  • On the heels of our successful Excel output enhancements, we've applied this same speed boost to PowerPoint for this release. No additional configuration is required, just enjoy output speeds that are exponentially faster than previous versions and do not require PowerPoint to be opened to run.

New in Steelray Project Analyzer 4.1 Build 502 (May 25, 2015)

  • Version 4.1, Build 502 of Steelray Project Analyzer is a feature/maintenance release.
  • Attention Excel Users: All of our Microsoft Excel outputs have been updated to use Microsoft Excel 2007 or better. What this means to you is that we're able to output Excel files from Analyzer almost instantaneously. If you use Excel based reports in Project Analyzer, this is going to be a signficant performance boost. We have included new templates for template based outputs. You will need to update those references. If you use custom templates, please update those to use the ".xlsx" file extension.
  • We've also addressed some compatibility issues with Microsoft Project 2013 files.

New in Steelray Project Analyzer 4.0 Build 498 (May 25, 2015)

  • Version 4.0, Build 498 of Steelray Project Analyzer is a maintenance release. Anyone who uses the Microsoft Excel outputs with Steelray Project Analyzer is highly encouraged to download this update. Times to produce Excel Analyzer Scorecards and GAO Reports have increased by orders of magnitude.
  • In addition to this change, there was a fix to protected reports where SPA filters were not being loaded in protected reports.

New in Steelray Project Analyzer 4.0 Build 496 (May 25, 2015)

  • Version 4.0 of Steelray Project Analyer has added a report gallery. The gallery is a visual representation of all of the reports available within Project Analyzer. Each thumbnail provides a basic visual of what the report provides. More information can be obtained at a glance by hovering over each thumbnail.
  • Select a report with a single click. When a report is selected, detailed information about the report is displayed along with a mock up of the output. When a report is added, the configuration screen for that report is brought up (if necessary) and a progress indicator denotes when the configuration is complete.

New in Steelray Project Analyzer 3.2 Build 452 (Nov 14, 2012)

  • Support for Primavera P6 Export Files
  • Expanded support for UN/CEFACT.
  • Speed and memory improvements for large Microsoft Project files.
  • Customer Experience Program.

New in Steelray Project Analyzer 3.0 Build 439 (Aug 23, 2012)

  • Much improved performance on schedules with large numbers of resources.
  • Faster filtering in Microsoft Project
  • Added Status Date support for SPA filters
  • Improved aesthetics for Project Server and Excel Analyzer Scorecard
  • No grade criteria no longer impacts overall score.
  • Support for Oracle Primavera v6 r8.2
  • Integration with Steelray Project Viewer for UN/CEFACT
  • Support for inline schemas in the UN/CEFACT validator