What's new in energyPRO 4.9.330
Nov 9, 2023
- IMPROVEMENTS:
- New OPTIMIZE module
- Fuel demand
- Forced operation of energy conversion units
- New min., max. and sum time series functions
- Private wire functions in MILP
- ERRORS FIXED:
- OPERATION, calculation fails when planning period is longer than a year
- Input data, possible to load wrong type of data
- Energy Conversion Report. Hours of operation incorrect
- Battery, capacity field not updated when changing utilization
- Markets, when using timeseries in payments for fixed tariff market wrong timeseries can be used
- Report, energy conversion, annual. Missing total electricity consumption if only one consumer
- REGION, error when loading site from project file
- Reports, emission reports come out with zero values
- Activation statistics, in some cases you have a message regarding unknown data fields
- Heat demand not met message, where it seems like demand is met
- Thermal solar collector, Doubling solar thermal Output when having multiple fuels
- COMPARE, changing load on ECU in reference is not reflected in alternatives
- Reports, energy conversion annual, Region, missing cooling production table in demand site
- Reports, energy conversion annual, wrong showing of energy conversion units in REGION when having cooling
- Fixed tariff market, you can have an error when using peakimported formula
- Built-in energy conversion units, when having fuel as output the capacity limit is not respected
- Energy conversion units, when setting start of Operation restricted to period default is end of planning period
- Report, Operation income, error in amount when price is zero
- Duration curves, in some cases electricity consumption and losses are not included
- Export energy conversion, process heat demand is labelled heat demand
- Export economy – error if paymentgroups does not contain payments
- Copying out TSF returns dataset with index outside planning period
- MILP. Operation period is not overruled by change load frequency when it should
- Electrolyzer When having no electric capacity in electrolyzer, error pops up when starting calculation
- US measuring units, Discrepancy between energyPRO calculation and exported energy conversion
- Energy conversion unit, It is possible to edit text in table in operation tab
- energyTRADE, Progress bar missing when fetching data and/or calculating
- energyTRADE. Bidding table is not updated when selecting date in calendar dropdown.
- energyTRADE, Cannot choose traded electricity for payments
New in energyPRO 4.9.189 (Aug 1, 2023)
- ERRORS FIXED:
- Activation, error when trying to make an activation
- Export energy conversion, in some cases, when having a user defined measuring units template, demands have wrong values when exporting energy conversion
- Loading energy conversion units from our database, they are connected to all the fuels in the project
- Time series function, in some cases, it is not possible to add new time series functions
New in energyPRO 4.9.180 (Jul 7, 2023)
- IMPROVEMENTS:
- Time series, handling of time series has been made faster
- Tools, results of hydraulic transmissions can be exported
- ERRORS FIXED:
- MILP, market payments are not included when first payment has zero amount or price per unit
- INTERFACE, problem with reading txt file
- Energy conversion, graphic. In some cases, when changing order of energy conversion units, energyPRO recalculates
- Progress window missing header and button in COMPARE
- Compare key financial figures, payback and internal rate of return graphs fail
- Key financial figures, QI returns in some situations wrong result
- Financing, table is not updated when opening
- Cash flow graphic, wrong values in the first two months
- Changing the colour of ECUs makes energyPRO recalculate
- Reports, wrong measuring unit for fuel storage in exported energy conversion
- Electrolyser, graphical user interface setting is reset when editing
- Entering energy conversion unit changes the model to modified
- Analytic calculation, Call back error when having parallel calculation
- energyTRADE, Change load no more frequently than causes error
- In rare occasions, loading a time series made a payment group in the list of time series
- When loading an energy conversion unit, you are asked to select a fuel, but nothing happens
- When saving previous version of energyTRADE model it is renamed to .~epp instead of .~etp
- Graphical userinterface, when allowing transmission, we are missing line from other site to rejection unit
- Graphical userinterface, the cooling connection from other site to cooling rejection is red instead of blue.
- The window “There is a new energyPRO update available” refers to 4.5 in Danish version
- Fixed tariff markets, show as graphic shows wrong results when entered first time
New in energyPRO 4.9.133 (May 3, 2023)
- IMPROVEMENTS:
- Load change restrictions
- Payments handled at timestep level
- New Electrolyzer model
- Option of different outputs on PV, Heat pump and Solar collector
- Speeding up operation strategy calculation
- ERRORS FIXED:
- Battery Storage Content – wrong unit conversion
- COMPARE, heat pump is not synchronized across alternatives
- Complex conversion tables, changing order of columns is not saved
- Creating a new model and next opening an existing model causes the new model to be deleted
- Annual key figures. FP(_) function not returning a value when fuels have no heat value
- Energy conversion monthly and overview report, missing line with zero fuel consumption
- Energy conversion unit has NAP for whole planning periods, but still it has starts
- Energy conversion unit Wind turbine, no warning when windspeed time series is missing
- Energy conversion unit, when deleting fuel, wind farm has an error
- External conditions, Time series function with functions set by cycle periods is not saved
- Graphics, when right clicking any graph but the top one and select edit, the top graph is appearing
- Heat pump window is very slow on opening and closing
- Input data, Missing the checkbox below connection restricted to a period in a transmission
- Investment form, the font size is too small
- MILP, electricity demand is not added to LP file, when not having electricity markets
- MILP, Error in modelling starting up
- MILP, Precision is not set when using CPLEX solver
- MILP, start and stop time is failing when having operation or non operation period equal to or less than calculation step
- MILP, User defined units cannot fulfill electric demands on other electricity markets
- MILP, wrong feeding into LP file when in power curves the value in line below is higher than the value in line above
- MILP, wrong feeding into LP file when on an energy conversion unit moving a fuel from input to output
- Miscellaneous, in some cases progress bar is missing
- Names, underscore is not allowed in start, but is replaced by underscore
- Operation strategy to MILP, Market payments, All markets is not handled correct
- Payments, Error in WorkOfPumps when Price per Unit is a time series
- Projects saved in 4.7 fails in 4.8 when the user had INTERFACE in 4.7 but not in 4.8
- PV, more year calculation, losses fail when referring to a time series function
- REGION model, error when moving demand to other site
- Report, energy conversion, annual gives in some cases an error with incompatible conversion types
- Reports, Compare cashflow report, revenues and operation expenditures are not correct in some cases
- Reports, energy conversion graphic not showing correct graphs when using regions
- Reports, Energy conversion, annual and monthly, Operation hours are above number of hours in the year
- Reports, Error on cooling load duration curves for options other than demand only where the cooling comes from another site
- Reports, in some cases process heat rejection unit causes Production, graphic to crash
- Reports, Incorrect cooling load duration curve
- Reports, Production, carpets crashes in some cases when fuel production
- Reports, production, graphic, E-cars have wrong measuring units
- Reports, Technical assumptions, errors on user defined units producing fuel
- Time series function, conversion table and cycle periods are not synchronized in COMPARE
- Time series function, cycle periods, when deleting any line the last one is deleted
- Time series function, cycle periods, when right-click and delete on the Time series function form, the time series function is deleted
- Translation issue when importing a payment
- energyTRADE, after being in configuration, an extra time column appears in energy table
- energyTRADE, export energy conversion, wrong formatting
- energyTRADE, exported electricity payment gives wrong results
- energyTRADE, illegal type error message plus HeatBidPowerCurve error
- energyTRADE, Missing translation to Danish
- energyTRADE, no trading, missing production and consumption in energy type table
- Capacity limits for regulating bids not respected
- Data provider, update of energy taxes inserts a line with zero
- Operation strategy calculation does not include traded electricity payments
- Planned production not shown in graphics and realizable production equal to zero
- Traded electricity payments. Wrong values in lp file
- When having non availability periods you have in some cases negative heat production
New in energyPRO 4.8.461 (Oct 6, 2022)
- IMPROVEMENTS:
- Hydraulic calculation of district heating
- Option of using new MILP solver, HiGHS
- Time series function, option of 2-dimensional conversion table
- Time series function, option of defining cycle periods, similar to fixed tariff market
- Electricity demands can be connected to different markets
- energyTRADE, new specific energyTRADE file format
- energyTRADE, access to the single sites on production, graphic
- ERRORS FIXED:
- Calculation, error when going from 1 year calculation to more years calculation
- COMPARE, in some cases, Energy conversion report causes unnecessary recalculation
- COMPARE, in some cases, loading CHP gives fuel error
- COMPARE, issue with Non availability periods in some cases
- COMPARE, when adding thermal storage to reference it shows as desynchronised in alternative
- Deleting or setting non availability periods on Energy conversion units makes energyPRO close without warning
- Economy, fixed payments effect the operation strategy
- Energy conversion unit, problem with loading Non Availability Periods
- Energy conversion units, clearing time setting of non availability period causes error
- Energy conversion units, negative values in power curves shall not be allowed
- Energy conversion units, PAPFUEL expression returns zero
- energyTRADE, energy conversion file is not in same timestep as calculation
- energyTRADE, error operation income when using user defined day-ahead bid
- energyTRADE, Hvide Sande model is not running in 4.8
- energyTRADE, in table the currency of the project shall be shown
- energyTRADE, in table the measuring unit shall be shown
- energyTRADE, option of selecting planned production as time series function
- energyTRADE, with calculation step of 15 min the hourly average in table is wrong
- energyTRADE: wrong results with planned production and ramping activated
- Error in function gives problem opening project file
- Error warning, missing error warning when deleting time series
- Export energy conversion, Fuel production is not appearing when using fuel unit and the resolution is month or year
- FINANCE, when having yearly optimization, the calculations are not in parallel
- Fuel storage, unit of graph not always correct
- Full load hours not calculated with fuel input/output
- Heat rejection, in some cases a 4.7 project with heat rejection cannot be opened in energyPRO 4.8
- Hydraulic calculation: Heat loss not calculated correctly
- INTERFACE, text reports have a data separator too much at end of each line
- MILP, wrong result when having energy conversion unit having both input and output of same energy type
- Misspelling in privacy warning and terms of use acceptance
- Operation strategy window, change of month and covering own demand issue
- Payments, FPCap causes different operation
- Payments, FCCAP and FPCAP return zero
- payments, FPCAP effects the MILP calculation
- Payments, in some cases the fuel amount is not correct
- Payments, Index function fails
- Payments, PeakExportedElectricity makes calculation error.
- REGION, loading a site causes an error
- Reports, Cash flow, graphic, Cash Account is one month off
- Reports, Compare cash flow, wrong text, shall be Cash Surplus instead of Cash Account
- Reports, Compare key financial figures, graphs become too small on some computers
- Reports, COP Heating instead of COP Cooling
- Reports, full load hours not calculated correct in some cases
- Reports, having more than one fuel, the copy data to spreadsheet is resetting fuel numbers
- Reports, in some cases text is going below frame
- Reports, issue with full load hours in heat pumps
- Reports, QI payments are returning zero
- Reports, utilization factor 0% if fuel output specified as TSF or TS
- Reports, utilization factor is wrong when having process heat production
- Reports, utilization factor of 0% for units only consuming an energy type
- Reports, wrong total efficiency if one of the outputs is a fuel
- Solar, array shading is wrong when solar PV or collector has zero inclination
- Solar, in case of inclination of zero, array shading is wrong when it comes to beam radiation
- Switching from process heat demands to heat demands causes run error
- Time series function, changes in symbol is not updated in complex formulas
- Time series, in some cases it is not possible to delete from right click menu
- User defined storage, as graphic, temperature shall not be shown
- User defined storage, loss settings are lost